A
A
EMERGENCY CUT OFF AT ARMENIAN NUCLEAR POWER PLANT
Support A1+!Today at 14:30, an emergency cut off was made at Armenian Nuclear Power Plant. As a result of precipitous leaps in power voltage, security system operated on time and reactor was cut off. That’s why power voltage plummeted to the lower level all over the republic. At 19:00 representatives of the ANPP assure our correspondent that situation is stable and controlled.