Danger of collapse felt at any point
The State Committee of Water Industry recently studied the bulwark of Azatan reservoir in Shirak Marz. The estimate for the reservoir reinforcement hasn't been drawn up. The Marzpetaran has already expressed readiness to help construction works.
The rescue service of the RoA Minister of Emergency Situations received an alarm signaling to a water overflow and possible collapse of the bulwark.
Although the overflow has been stopped, the local residents fear that the bulwark may collapse at any point as it takes water to neighbouring farms where spring sowing is already underway.
The residents blocked the way of the water with 150 sacks of sand and were able to strengthen the stronghold. Finally, they were able to find the reason for the water overflow. The bulwark turned out to have been built on an empty surface as the earth had sunk during the years.
The reservoir was built some fifty years ago, in the 1960s.
It can hardly be considered an engineering structure meeting all standards and demands. Besides, the reservoir doesn't have sewerage.
The spring sowing is already underway in the marz while the bulwark is rundown and needs urgent fixation.
According to preliminary estimation the reinforcement will cost about 1 000 000 drams.
Tsayg TV, Gyumri