Open news feed Close news feed
A A

"Reservoir was filled without permission"

Social
e689a7dfd4bd4c3b11fdbe1af700ec7b

"ArmHydroEnergyProject" CJSC has presented its views on the accident at Geghi reservoir.
On the night of May 14, an accident took place at Geghi reservoir belonging to Zangezur Copper-Molybdenum Factory located in the district of Geghi rural community.
The waters of the reservoir were mixed with the water flowing out from Voghch River. The incident damaged the gas pipeline running through the village and stopped energy supply.
In Armen Davtyan's article "I was injured from the accident" posted on "A1+"'s website on May 15, 2010, general director of Zangezur Copper-Molybdenum Factory Maxim Hakobyan said the accident was due to incorrect drafting.

"The technical solutions for the tunnel were wrong. This is a complex hydro-technical structure and only retrained engineers can give solutions," said general director Maxim Hakobyan.

This view was then discussed at the technical council of "ArmHydroEnergyProject".

"According to the council, as long as the reasons for the accident have not been studied and cleared up, all statements and groundless charges about the draft are incorrect, but we can say that the following was done:

-the reservoir was being filled without permission for exploitation
-there were no checking meters installed in the structure

"ArmHydroEnergyProject" will create a working group which will not include retrained engineers (as mentioned in the article), but the company's high-profile, specialized engineers who will conduct studies and give a final conclusion on the accident after observing the reservoir.

Only after the final conclusion of the working group will it be possible to find the guilty and start repairing the reservoir," as stated in the statement.